Istana Karang Laut

Search

Download
You are here: Home Company

Company

Policy Statements

TEAMWORK

PT ISTANA KARANG LAUT has grown dramatically since its inception in 1981. Much of this growth can be attributed to each and every member working as a team. A great sense of pride has evolved from past accomplishments, and that pride has contributed to the quality of our performance.

PT ISTANA KARANG LAUT's leadership has strived to keep its infrastructure as direct and open as possible. For example, the company maintains a streamlined management organization who has complete access to upper management during inplementation of projects.

HEALTH, SAFETY AND ENVIRONMENT POLICY STATEMENT

PT ISTANA KARANG LAUT, considering that health, safety and environmental issues are a focal part of its operations is a major part of its responsibilities has established the following policy:

  • Operation success shall be achieved in conjunction with a good and effective accident prevention practice based on internationally accepted codes and practices.
  • All local goverment regulations will be considered as minimum requirements.

PT ISTANA KARANG LAUT is taking all reasonable steps within its power to meet its managerial responsibility paying particular attention to the provision of :

  • Systems of work, that are safe.
  • A safe place to work.

PT ISTANA KARANG LAUT is providing leadership to all employees in following safety operational procedures and in developing healthy and safe working attitudes and habits.

These PT ISTANA KARANG LAUT policies, safety regulations / standards and codes of practices are made known to all persons involved on projects and shall be met as a priority.

QUALITY ASSURANCE POLICY STATEMENT

Our comprehensive quality assurance program focuses on setting procedures, systems, and controls in place. With the system established, PT ISTANA KARANG LAUT consistently evaluates man-hour accountability, vendor reliability and quality, in-house data processing systems, cost estimation, and improved methods to attract and retain talented personnel.

Quality is no longer simply a matter of reducing defects but has become a comprehensive movement reaching into all aspects of the process of procuring goods in the market.

PT ISTANA KARANG LAUT's comprehensive quality assurance program focuses on reducing internal costs, rework and waste. This focus helps decrease lost time and liability rates, boost productivity and improve overall efficiency. Clients benefit from the resultant quality environment through more competitive pricing and better-designed, more reliable products.

 

 
Page 2 of 2

Project News

March 2013 - Bangladesh
Mechanical Completion of PETROMAX Condensate Refinery in Bangladesh

October 2012 - Indonesia
Award of large CNG Plant for peak shaving of gas fired power plant in East Java, Indonesia

October 2012 - Bangladesh
Award of several Process Equipments by CHEVRON Bangladesh.

February 2011 - Azerbaidjan
Contract for Off-shore Gas Compression Station

September 2010 - Indonesia
Contract for 2 Gas Metering Stations in South Sumatera and 50 km Connecting Pipeline.

July 2010 - Bangladesh
Contract for a Condensate Fractionation Plant with Naptha Hydro Treater and Catalytic Reformating Unit

December 2006 - Indonesia
Contract from BP WEST JAVA for EPCI for Modification of Existing on Offshore Platform at NGL A & NGL B and Provision of New Onshore Receiving Facilities (ORF) at Cilamaya Gas Compression Station (SKG) of Pertamina

November 2006 - Indonesia
Contract from PERTAMINA UPMS VI for Design, Engineering, Procurement, Fabrication & Install 1 (one) Unit Skid Meter with 150-500 KL/Hour Capacity - "Metering System at Jetty 5A Project"

October 2006 - Turkmenistan
Contract from TURKMENGAZ for Supply of Two Flares System - "Compressor Station and Complex Gas Treatment Project"

July 2006 - Indonesia
Contract from PERTAMINA UP VI for Design, Fabrication, Supply, Installation, Commissioning and Training of LPG Metering and Providing System - "EPC-LPG Metering System Project"

June 2006 - Indonesia
Award of Condensate Metering Package by JGC/KBR/PFN Joint Operation for BP TANGGUH “LNG Project”

March 2006 - Vietnam
A Second Contract from VIETSOVPETRO for The Supply of Flare System for PM3 - "CA MAU Project"

February 2006 - Indonesia
Contract from PT. TRANSPORTASI GAS for Metering System Calibration Agent for TGI, CONOCOPHILLIPS, PETROCHINA -"Calibration Agent Project"

October 2005 - Indonesia
Contract from SANTOS MALEO Indonesia for The Supply of Custody Transfer Gas Metering System

September 2005 - Vietnam
Contract from VIETSOVPETRO for Supply of Pig Launchers/Receivers for PM3 - "CA MAU Project"

July 2005 - Singapore
KEPPEL GAS awards EPC Contract to JO of PT. IKL/ APECO for Design, Supply and Installation of 2 Units Ultrasonic Gas Metering Systems and Associated Utilities

July 2005 - Indonesia
Award of EPCI Gas Compressor Package for TAC PERTAMINA - ELLIPSE ENERGY JATIRARANGON WAHANA LTD

March 2005 - Uzbekistan
Contract for Reconstruction of Gas Boosting Compressor Station KOKDUMALAK 1.100 MMSCFD, 260 bars

December 2004 - Turkmenistan
Replacement of Main Flare for TURKMENBASHY Refinery

September 2004 - Uzbeksitan
Supply Contract for the BUKHARA Refinery Turnaround

September 2004 - Indonesia
PERTAMINA - PETROCHINA EAST JAVA Places Order to PT. IKL for 2 Units Metering Skids

November 2003 - Indonesia
KUFPEC (Indonesia) LTD Places Contract for the Operation & Maintenance (OM) of the Bula Field Facilities in Seram, Ambon

July 2003 - Indonesia
PT. TECHNIP Indonesia Places Contract to PT. IKL for the Supply of Gas Metering System for CONOCOPHILLIPS “BBSD Development Project” in Indonesia

February 2003 - Indonesia
Order from PT. Tripatra Enginees & Contructors for De-Ethanizer & De-Propanizer package

November 2002 - Turkmenistan
Award of Reconstruction of 6 Flares 110 meter high

November 2002 - Indonesia
Petrochina International Jabung Ltd place contract for Skid mounted (20 MMscfd) JT dewpoint contract system for - NG Plant Expansion

July 2002 - Indonesia
Conoco Indonesia Inc Ltd. Place Contract for BELIDA refrigeration package Dew Point Control and Support Equipment

July 2002 - Indonesia
CO2 Plant (50 MMscfd) commissioned and handed over to UNOCAL INDONESIA

May 2002 - Indonesia
Haliburton award contract to PT. Istana Karang Laut for Gas Custody Transfer Metering Skid and Meter Prover Package for Conoco Belanak Poject

April 2002 - Indonesia
Conoco Indonesia Inc Ltd. Place Contract for HANG TUAH Refrigeration Package and associated equipments - Dew Point Equipment

April 2002 - Indonesia
ExxonMobil Indonesia order Calibron Sycotrack Compact Meter Prover

April 2002 - Indonesia
ExxonMobil place order for OmniFlow Computers

February 2002 - Indonesia
Unocal Indonesia place order for overhaul and upgrade of SPM # 5

January 2002 - Singapore
Senoko PowerGas award EPC contract to JO of APECO/IKL for design, supply and installation of 10 units Ultrasonic meter systems + associated pipeworks for Senoco Power Station

Completed on July 2001 - Indonesia
BP West Java Ltd. place order to modification & overhaul of Single Point Mooring (SPM) # 3 to be used as permanent mooring system for 230 000 DWT FSO Tanker

January 2001 - Indonesia
Hyundai E & C Co. Ltd for Supply of Condensate / Gas Fiscal Metering System - "Suban Gas Project"

Plaza City View, 4th Floor

Jl. Kemang Timur No. 22
Jakarta Selatan, 12510
I N D O N E S I A
Telp: +62 21 7182018, 7182019
Fax: +62 21 7181988, 7181989

Contact Person:
sales.jakarta@entrepose.com


Who's Online

We have 1 guest online

Visit Counter

mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday1
mod_vvisit_counterYesterday79
mod_vvisit_counterThis week80
mod_vvisit_counterLast week765
mod_vvisit_counterThis month2630
mod_vvisit_counterLast month3429
mod_vvisit_counterAll240439

Online (20 minutes ago): 2
Your IP: 54.198.163.124
,